Our involvement, led by PJ Careys, tasked us with delivering the complete temporary works design, certification, and shared supervision of an innovative electrically climbed jumpform system.
Collaborating with Multiplex and P J Careys, we embraced a refreshing approach where the
principal contractor, main subcontractor, and system supplier worked together seamlessly, sharing responsibilities to ensure adherence to the original plan.
This project stood out for several reasons, including our initial design and full 3D modeling, offsite manufacturing and assembly, large nighttime deliveries, and site assembly. We successfully
navigated through key milestones such as commissioning, first casting, self-climbing, rig adaptations, and the final jump to the roof before dismantling.
One Leadenhall London exemplifies what can be achieved when different entities in the industry
come together as a cohesive team. It was a remarkable demonstration of collaboration, innovation, and determination, and we are proud to have been a part of it.