Product Summary
FINAN Formworks offers a superior design solution to form building cores faster than any other system available today. Through effective design, we save our clients millions over time by offering a method that consistently reduces program times and ensures projects stay ahead of critical paths.
The FINAN Formworks E-Climb 25 & 50 Jumpform systems are two main platform systems with panels fully retractable from both sides and are fully ‘encased’ by cladding protection sheeting and edge protection. The formwork system is designed in such a way as to allow the removal of panels to suit the reduced shape of the core wall in the upper levels.
Electronic screw jack Jumpforms have been tried and tested for the last 30 years since their introduction to the industry by the late Norm Flodine of Cantilever. The technology provides far better results than hydraulic systems due to their accuracy and consistency when jumping. They are also much faster, require less time to level, and suffer no hydraulic hose blowouts or leakages. The jacks are fully integrated into the system requiring no repositioning throughout the project.
Product Features
- Ability to form all vertical concrete elements including shear walls and columns
- Designed for offsite pre-assembly with transportation requirements in mind.
- Design ensures maximum storage of materials on the top deck (minimum 2.5KPa)
- Lightweight aluminium top-hung shutters are fast and easy to operate.
- Electronic top-mounted jacking system (no repositioning of hydraulics or use of fluids).
- Integrated features such as access stairs, placing boom frames, davits, hanging screens, hoists and more can be positioned / added as required.
- Commissioned in a single operation with no need for trailing decks. This means the slabs can be within one floor of the Jumpform lower deck.
- Toilet block and office space can be configured on top for ease of logistics
Product Advantages
- System can be jumped on lower concrete strength of 12MPa (generally within 12-hour window).
- Jumped and levelled in as little as 60 minutes from a single control point.
- Large working deck with fully barricaded workspace that can be tailored to contractors.
- Advanced lightweight aluminum shutters for easy erection and pre-assembly
- 80% faster offloading on site, manpower/time saving 1- or 2-man job
- Integrated Access Staircase